The Relationship Below 80% of the Owner Estimate Price on Construction Projects to Project Performance
##semicolon##
https://doi.org/10.47616/jamrems.v4i1.396##semicolon##
Price##common.commaListSeparator## Owner Estimate Price##common.commaListSeparator## Project Performanceپوختە
This study aims to analyze the causes of price quotes below 80% of the owner estimate price and how the relationship between the variable price quotes below 80% of the owner estimate price with project performance. This research was conducted by distributing questionnaires to service users involved in the implementation of projects with price quotes below 80% of the owner estimate price in Bali Province in the 2020-2022 fiscal year. The data from the distribution of questionnaires will be analyzed using the RII and SEM-PLS methods. Based on the RII data analysis, it is found that the dominant factors causing projects with price quotes below 80% of the owner estimate price are high competitiveness between service providers, service providers looking for small profits, service providers do not understand the basis of regulations related to the cost of taxes and required guarantees, service providers are unable to identify the risk of additional costs arising from the mismatch between the planned schedule and the realization and the factor that service providers are able to understand waste construction so that service providers can submit low bid prices. The relationship between price quotes below 80% of the owner estimate price and project performance has a positive and significant relationship. Price quotes as an independent variable are able to influence the dependent variable, namely project performance. Because price quotes below 80% of the owner estimate price and project performance have a positive and significant relationship, to improve project performance, namely in a way for service providers to think more about and take into account in detail before submitting a price quote so that during the implementation of project performance can be done optimally.
##plugins.generic.usageStats.downloads##
سەرچاوەکان
Agung, I.G., Putera, A., Bagus, I., Adnyana, P., Gede, I., Wahyudi, B. (2019). Model Penyusunan Harga Perkiraan Sendiri (HPS) Pengadaan Barang/Jasa Pemerintah Di Provinsi Bali. Jurnal Spektran, 7(2): 204–211.
Fandopa, R. (2012). “Pengelolaan Resiko Pada Pelaksanaan Proyek Jalan Perkerasan Lentur Pt X Dalam Rangka Meningkatkan Kinerja Mutu Proyek.”
Ghozali, I. (2021). Partial Least Squares, Konsep, Teknik, dan Aplikasi Menggunakan Program SmartPLS 3.2.9 untuk peneliti. In Universitas Diponegoro (Vol. 3).G. Arslan and Kivrak.S. 2008. Critical success factors to company success - G. Arslan and S. Kivrak. 43–46.
Hair, J.F., Hult, G.T.M., Ringle, C.M., Sarstedt, M., Danks, N.P., Ray, S. (2021). Partial Least Squares Structural Equation Modeling ( PLS-SEM ) Using R. Open Acces, Ed. Springer.
Hair, J.F., Jr., H.G.T.M., Ringle, C.M., Sarstedt, M. (2014). A Primer on Partial Least Squares Structural Equations Modeling (PLS-SEM). Sage Publications. Journal of Tourism Research, 6(2).
Hair, J.F., Risher, J.J., Sarstedt, M., Ringle, C.M. (2019). When to Use and How to Report the Results of PLS-SEM. European Business Review, Vol. 31.
Henseler, J., Ringle, C.M., Sarstedt, M. (2015). A New Criterion for Assessing Discriminant Validity in Variance-Based Structural Equation Modeling. Journal of the Academy of Marketing Science, 43(1).
Henseler, J., Ringle, C.M., Sinkovics, R.R. (2009). The Use of Partial Least Squares Path Modeling in International Marketing. Advances in International Marketing, 20.
Husin, A.E., Sustiawan, F. 2021. Analisa RII (Relative Important Index) Terhadap Faktor-Faktor Yang Berpengaruh Dalam Mengimplementasikan BIM 4D Dan M-PERT Pada Pekerjaan Struktur Bangunan Hunian Bertingkat Tinggi. Jurnal Aplikasi Teknik Sipil, 19(4): 417.
Indriyani, E., Sulistiyawati, S. (2021). Kebijakan Refocussing Dan Realokasi Anggaran Tahun Anggaran 2021 Serta Pengaruhnya Dalam Meningkatkan Perekonomian Indonesia Akibat Dampak Pandemi Covid- 19. In Pusat Pendidikan Kelautan dan Perikanan, Kementerian Kelautan dan Perikanan.
Kementerian PUPR RI. (2020). Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia Nomor 14 Tahun 2020 Tentang Standar dan Pedoman Pengadaan Jasa Konstruksi Melalui Penyedia.
Kementrian PUPR RI. (2020). Menteri Basuki : Pekerjaan Konstruksi Yang Ditunda Akibat Realokasi Anggaran Pembangunan Infrastruktur Sebesar Rp 44,58 Triliun Akan Jadi Prioritas Di Tahun 2021. Kementrian PUPR RI, pp. 1–9.
Lu, R., Zhao, X., Li, J., Niu, P., Yang, B., Wu, H., Wang, W., Song, H., Huang, B., Zhu, N., Bi, Y., Ma, X., Zhan, F., Wang, L., Hu, T., Zhou, H., Hu, Z., Zhou, W., Zhao, L., Chen, J., Meng, Y., Wang, J., Lin, Y., Yuan, J., Xie, Z., Ma, J., Liu, W.J., Wang, D., Xu, W., Holmes, E.C., Gao, G.F., Wu, G., Chen, W., Shi, W., Tan, W. (2020). Genomic Characterisation and Epidemiology of 2019 Novel Coronavirus: Implications for Virus Origins and Receptor Binding. The Lancet, 395(10224): 565–574.
Pangaribuan, J., Safuan, S., Musa, M. (2022). Penerapan LPSE (Layanan Pengadaan Secara Elektronik) Untuk Kemudahan Kegiatan Pengadaan Barang Dan Jasa. Syntax Literate ; Jurnal Ilmiah Indonesia, 7(2): 2623.
Pemerintah Republik Indonesia. (2021). Peraturan Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah Republik Indonesia Nomor 12 Tahun 2021 Tentang Pedoman Pelaksanaan Pengadaan Barang/Jasa Pemerintah Melalui Penyedia. , Berita Negara Republik Indonesia Tahun 2021 Nomor 593 .
Rochman, F., Wahyuni, H.C. (2017). Analisa Pengaruh Pengendalian Kinerja Proyek Terhadap Mutu Proyek Konstruksi Dengan Menggunakan Uji Statistika. J@ti Undip : Jurnal Teknik Industri, 12(1): 1–6.
Supriyatna, Y., Sibuea, P. (2021). Penawaran Penyedia Di Bawah 80% HPS : Permasalahan Dan Alternatif Solusi. In Direktorat Jenderal Bina Konstruksi.
Supriyatna, Y., Sibuea, P., Bakeri, S., Simanjuntak, N., Hilda Isfanovi, Angga Wahyu Pratama, Nicolas Aji Wahyu Pamungkas, D., Indryhapsari, K. (2021). Kajian Responsibilitas Nilai Kontrak Pekerjaan Jasa Konstruksi 2015 – 2019.
Susanto. (2009). “Evaluasi Kinerja Waktu Dan Biaya Pada Proyek Bangunan Bertingkat Dengan Pendekatan Metode Earned Value (Studi Kasus : Proyek ABC Di PT.X).”
##submission.downloads##
بڵاو کرایەوە
چۆنییەتی بەکارهێنانی سەرچاوە
ژمارە
بەش
##submission.license##
##submission.copyrightStatement##
##submission.license.cc.by-sa4.footer##