Study of Factors Affecting Claim Submissions in Housing Project Implementation Between Developers and Consumers
DOI:
https://doi.org/10.47616/jamrems.v7i2.723Parole chiave:
Construction Claims, Relative Importance Index, Perception, Mann-Whitney U Test, Descriptive StatisticsAbstract
The successful implementation of a developer project depends on the cooperation of all parties involved, including the developer company itself, consumers, banks, and notaries, as stipulated in the Work Agreement. If one of the parties fails to professionally carry out their responsibilities, it may give rise to a claim. As an island with a high number of tourist destinations, Bali will certainly increase the number of residential locations to support tourism itself, making it possible for claims to arise in developer/construction projects. For example, in the case of Griya Asri Housing, where consumers/buyers had already taken delivery of the buildings from the developer, several problems arose with the houses over time. The consumers took the initiative to report these problems to the developer with the aim of having them repaired because the written and agreed agreement stated that a retention or warranty would be provided upon the purchase of a housing unit. Therefore, the consumers filed a construction claim against the developer. This study aims to identify the factors that cause construction claims to be filed and analyze the dominant factors that can influence the filing of claims in a housing project, identify differences in perception between developers and consumers regarding the factors that cause claims in a housing project, and determine the methods used by both parties to resolve disputes arising from construction claims. The research method used in this study is quantitative descriptive using a questionnaire as a research instrument. There were 70 research respondents, consisting of 35 consumer respondents and 35 developer respondents, with case studies of developer projects located in several provinces in Bali in the 2022-2024 fiscal year. The data were analyzed using the Relative Importance Index (RII), followed by the U-Mann Whitney test, and then processed using descriptive statistical analysis. From the results of the data analysis, The most dominant factor causing claims to be filed in developer projects in Bali Province is defective or imperfect workmanship by developers. There is a significant difference in perception between consumers and developers regarding the factors causing claims in a construction project in Denpasar City, as the obtained value of p= 0.008 is significantly smaller than (<) the probability value of 0.05. The method considered most appropriate for resolving construction disputes arising from claims is negotiation.
Downloads
Riferimenti bibliografici
Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021). A review of artificial intelligence based risk assessment methods for capturing complexity-risk interdependencies: Cost overrun in construction projects. International Journal of Managing Projects in Business, 14(2), 300-328. https://doi.org/10.1108/IJMPB-02-2019-0047
Álvarez-Pozo, A. H., Parma-García, M. I., Ortiz-Marcos, I., Bautista, L. F., & Atanes-Sánchez, E. (2024). Analysis of causes of delays and cost overruns as well as mitigation measures to improve profitability and sustainability in turnkey industrial projects. Sustainability, 16(4), 1449. https://doi.org/10.3390/su16041449
Asadi, R., Rotimi, J. O. B., & Wilkinson, S. (2022). Investigating the relationship between reworks and contractual claims: The salience of contract conditions. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 14(1), 04521046. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000519
Assaf, S., Hassanain, M. A., Abdallah, A., Sayed, A. M., & Alshahrani, A. (2019). Significant causes of claims and disputes in construction projects in Saudi Arabia. Built Environment Project and Asset Management, 9(5), 597-615.
Awuah, K. G. B., & Abdulai, R. T. (2022). Urban land and development management in a challenged developing world: an overview of new reflections. Land, 11(1), 129. https://doi.org/10.3390/land11010129
Bahat, M. K., & Ergönül, S. (2025). Understanding the Root Causes of Construction Claims: A Narrative Review of Determinants and Preventive Strategies. Dicle Üniversitesi Mühendislik Fakültesi Mühendislik Dergisi, 16(4), 1157-1170. https://doi.org/10.24012/dumf.1759763
Bęś, P., Strzałkowski, P., Górniak-Zimroz, J., Szóstak, M., & Janiszewski, M. (2025). Innovative Technologies to improve occupational safety in mining and construction industries—Part I. Sensors, 25(16), 5201. https://doi.org/10.3390/s25165201
Christiawan, P. I., & Nguyen, T. P. L. (2026). Examining tourism driven peri-urbanization and its impacts on local livelihood dynamics in the global south: Lessons learnt from Bali, Indonesia. Cities, 176, 107263. https://doi.org/10.1016/j.cities.2026.107263
Dhakal, A. (2025). A Study on Causes and Impacts of Disputes on Selected Road Construction Contracts under Department of Roads, Nepal. Everest Advances in Science and Technology, 1(1), 44-52.
Francis, M., Perera, S., Zhou, W., & Nanayakkara, S. (2025). A Comprehensive Typology of Causes Leading to Disputes in Construction Projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 17(4), 03125006. https://doi.org/10.1061/JLADAH.LADR-1231
Hamid, A. R., Zulkarnain, S. H., Anwar, M., Suyuti, S., & Fatt, C. C. (2026). The Impact of Customary Land Rights Conversion on Local Communities and Economic Development in Bali. Asia Pacific Viewpoint, 67(1), 64-73. https://doi.org/10.1111/apv.70024
Hanberry, B. B. (2023). Urban land expansion and decreased urban sprawl at global, national, and city scales during 2000 to 2020. Ecosystem Health and Sustainability, 9, 0074. https://doi.org/10.34133/ehs.0074
Kikwasi, G. J. (2023). Claims in construction projects: how causes are linked to effects?. Journal of Engineering, Design and Technology, 21(6), 1710-1724. https://doi.org/10.1108/JEDT-06-2021-0312
Rimba, A. B., Atmaja, T., Mohan, G., Chapagain, S. K., Arumansawang, A., Payus, C., & Fukushi, K. (2020). Identifying land use and land cover (LULC) change from 2000 to 2025 driven by tourism growth: A study case in Bali. The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, 43, 1621-1627. https://doi.org/10.5194/isprs-archives-XLIII-B3-2020-1621-2020
Shao, Z., Sumari, N. S., Portnov, A., Ujoh, F., Musakwa, W., & Mandela, P. J. (2021). Urban sprawl and its impact on sustainable urban development: a combination of remote sensing and social media data. Geo-Spatial Information Science, 24(2), 241-255. https://doi.org/10.1080/10095020.2020.1787800
Weerasuriya, G. T., Perera, S., & Calheiros, R. N. (2025). Technological imperatives for issues in the certification of quality, progress, and payments in construction projects: A systematic review. Construction Economics and Building, 25(1), 25-48.
Wei, Y. D., & Ewing, R. (2018). Urban expansion, sprawl and inequality. Landscape and urban planning, 177, 259-265. https://doi.org/10.1016/j.landurbplan.2018.05.021
Yousri, E., Sayed, A. E. B., Farag, M. A., & Abdelalim, A. M. (2023). Risk identification of building construction projects in Egypt. Buildings, 13(4), 1084. https://doi.org/10.3390/buildings13041084
##submission.downloads##
Pubblicato
Come citare
Fascicolo
Sezione
Licenza
Copyright (c) 2026 Journal of Asian Multicultural Research for Economy and Management Study

Questo lavoro è fornito con la licenza Creative Commons Attribuzione - Condividi allo stesso modo 4.0.