Strategies for Handling Delays in Building Projects (Private) during the Construction Period in Badung Regency
DOI:
https://doi.org/10.47616/jamrems.v5i4.523Schlagworte:
Project Delay, Factors Causing Delay, Construction Period, Handling StrategyAbstract
Delay in construction projects is the inaccuracy of completion time in each activity or overall project activity that exceeds the time limit in the contract document.From the results of observations and interviews with several contractors who carry out building construction work, especially privately owned in Badung Regency, where the results show that there are still many projects that experience delays in implementation. This study aims to analyze what factors are dominant in causing delays and provide an overview of strategies for handling project delays during the construction period.Data collection using a questionnaire survey method. The research population was 16 building construction projects that were under construction in Badung Regency starting from 2022 - 2023 with 64 respondents. The data analysis method used is the Relative Importance Index (RII) method and hierarchical clustering in analyzing the dominant factors causing delays then focus group discussion (FGD) is used to help collect and provide information in discussions for the formulation of SWOT analysis. The priority strategy recommended for the project delay handling strategy is the WT strategy which explains the position of the defensive strategy in minimizing internal weaknesses and external threats so that the contractor as the project manager must be able to minimize existing weaknesses in the project and overcome threats in project implementation. While the recommended alternative strategies are WO, ST and SO strategies..
Downloads
Literaturhinweise
Alaloul, W. S., Liew, M. S., & Zawawi, N. A. W. A. (2015, August). The characteristics of coordination process in construction projects. In 2015 international symposium on technology management and emerging technologies (ISTMET) (pp. 159-164). IEEE. https://doi.org/10.1109/ISTMET.2015.7359021
Ammad, S., Alaloul, W. S., Saad, S., & Qureshi, A. H. (2021). Personal Protective Equipment (PPE) usage in Construction Projects: A Systematic Review and Smart PLS Approach. In Ain Shams Engineering Journal (Vol. 12, Issue 4). https://doi.org/10.1016/j.asej.2021.04.001
Azhari, F. M., & Mustofa, I. (2023). Strategi Meningkatkan Penggunaan Alat Pelindung Diri (APD) Pada Pekerja Proyek Konstruksi di Tulungagung. Engineering and Technology International Journal, 5(3), 2714–2755. https://doi.org/10.556442
Dharmayanti, G. C., Sudarsana, D. K., & Guhyathama, I. B. M. (2022). Upaya Penanggulangan Keterlambatan Pelaksanaan Proyek Konstruksi Di Kabupaten Badung. Jurnal Spektran, 10(1), 34. https://doi.org/10.24843/spektran.2022.v10.i01.p05
Ervianto, W. I. (2017). Tantangan Pembangunan Infrastruktur dalam Proyek Strategis Nasional Indonesia. Prosiding Simposium II –UNIID, September 2017.
Ervianto, W. I. (2023). Manajemen Proyek Konstruksi (L. Mayasari, Ed.; Terbaru). Andi.
Hasanti, Y. M., & Rohman, M. A. (2023). Kriteria Pemilihan Kontraktor pada Proyek Konstruksi Bagi Pengguna Jasa Swasta (Studi Kasus: Sektor Pakan Ternak) dengan Metode Analisis Faktor. Jurnal Aplikasi Teknik Sipil, 21(3), 249–258.
Hasib, H. S. Bin, & Hiyam, A.-K. (2021). Identifying Project delay factors in the Australian Construction Industry. International Journal of Structural and Construction Engineering, 171(3), 135–141.
Islam, M. S., Trigunarsyah, Bambang Hassanain, M. A., & Assaf, S. A. (2015). Causes of Delay in Construction Projects in Bangladesh. The 6th International Conference on Construction Engineering and Project Management (ICCEPM 2015), 8(06), 108–114. https://doi.org/10.36348/sjet.2023.v08i06.001
Khalim, M. A., Adi, H. P., & Rochim, A. (2021). Analisis Contract Change Order pada Pelaksanaan Proyek Konstruksi. Wahana Teknik Sipil, 26(2), 222–234.
Lingard, H., & Rowlinson, S. (2004). Occupational health and safety in construction project management. In Occupational Health and Safety in Construction Project Management. https://doi.org/10.4324/9780203507919
Murbayani. (2015). Manajemen Strategi Dalam Mempercepat Pelaksanaan Proyek Konstruksi. ASSETS, 5(1).
Naufal, A. M., Yufrizal, A. H., Latief, Y., & Machfudiyanto, R. A. (2021). Development Standard Operational Procedure of Safety Architecture Work in University of Indonesia Project Based on Work Breakdown Structure to Reduce Work Accidents. Journal of International Conference Proceedings, 4(2). https://doi.org/10.32535/jicp.v4i2.1248
Nugraha, A., Asnawi, M. H., Rahmah, P. F., & Purwandari, T. (2021). Analisis Klaster Hirarki untuk Mengelompokan Provinsi di Indonesia berdasarkan Indikator Kesejahteraan Rakyat. Seminar Nasional Statistika X. https://doi.org/10.1234/pns.v10i.84
Nyata, D. S., & Wiguna, I. P. A. (2018). Analisis Keterlambatan pada Proyek PT Jatim Taman Steel di Gresik dengan Menggunakan Lean Six Sigma Framework. Jurnal Aplikasi Teknik Sipil, 16(1), 15. https://doi.org/10.12962/j2579-891x.v16i1.2866
Omopariola, E. D., Windapo, A., Edwards, D. J., & Thwala, W. D. (2020). Contractors’ perceptions of the effects of cash flow on construction projects. Journal of Engineering, Design and Technology, 18(2), 308–325. https://doi.org/10.1108/JEDT-04-2019-0099
Rachid, Z., Toufik, B., & Mohammed, B. (2019). Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), 371–381. https://doi.org/10.1080/15623599.2018.1435234
Ramdan, I. M., Candra, K. P., Arlita, D., & Tura, S. (2019). Association of demographic characteristics of construction workers and work environments to workplace accident in high building (hotel) construction. Indian Journal of Public Health Research and Development, 10(12). https://doi.org/10.37506/v10/i12/2019/ijphrd/192218
Rusli, Muhammad Asdar, & Munir, A. R. (2019). Management and Development Strategy of Medium Class Housing Industry (Case Study of PT. Baruga Asrinusa Development). HJABE, 2(3). https://www.researchgate.net/publication/343513412
Safa, M., Shahi, A., Haas, C. T., & Hipel, K. W. (2014). Supplier selection process in an integrated construction materials management model. Automation in Construction, 48, 64–73. https://doi.org/10.1016/j.autcon.2014.08.008
Sandyavitri, A. (2008). Manajemen Resiko di Proyek Konstruksi. Media Komunikasi Teknik Sipil , 17(1), 23–38.
Shehata, M. E., & El-Gohary, K. M. (2011). Towards improving construction labor productivity and projects’ performance. Alexandria Engineering Journal, 50(4). https://doi.org/10.1016/j.aej.2012.02.001
Sita, T., & Mulyono, A. T. (2016). Pengaruh Komponen Manajemen Konstruksi Terhadap Capaian Mutu Pemeliharaan Preventif Perkerasan Kaku. Jurnal Transportasi, 16(2), 151–162.
Sudarsana, K. (2008). Pengendalian Biaya Dan Jadual Terpadu Pada Integrated Cost and Schedule Control in. 12(2), 117–125.
Sumarningsih, T. (2014). Pengaruh Kerja Lembur pada Produktivitas Tenaga Kerja Konstruksi. Jurnal Ilmu Dan Terapan Bidang Teknik Sipil, 20(1).
Sustiawan, F., & Husin, A. E. (2021). Analisa RII (Relative Important Index) Terhadap Faktor-Faktor yang Berpengaruh dalam Mengimplementasikan BIM 4D dan M-PERT pada Pekerjaan Struktur Bangunan Hunian Bertingkat Tinggi. Jurnal Aplikasi Teknik Sipil, 19(4), 417–426. http://iptek.its.ac.id/index.php/jats
Sutarja, I. N., Jaya, N. M., & Sukoyo, A. P. (2020). Aanalisis Faktor Penyebab Keterlambatan Penyelesaian Proyek Hotel Di Kabupaten Badung dan Kota Denpasar. Spektran, 8(2), 160–168. https://teras.unimal.ac.id/teras/article/view/210
Telford, T. (1995). Total Project Management of Construction Safety, Health, and Environment (Second). European Construction Institute.
##submission.downloads##
Veröffentlicht
Zitationsvorschlag
Ausgabe
Rubrik
Lizenz
Copyright (c) 2024 Journal of Asian Multicultural Research for Economy and Management Study

Dieses Werk steht unter der Lizenz Creative Commons Namensnennung - Weitergabe unter gleichen Bedingungen 4.0 International.